From beginning to end, the quality is second to none!
Some Pictures of the Construction of Lot 21
The chronicle of the construction of this home (which happens to be Lot 21) is only
one example of the craftsmanship that goes into every Tres Canadas home. Clicking on
each thumbnail will give you a larger image in a new window.
Main Floor
Mirador
The foundation is set.
The bricks go up
Steel reinforcements
It's all laid out well
A view from the road
The house is growing
The roof goes on
The back patio is shaping up
Niches at the Entry
The front door is being manufactured
Notice the ledge where the Boveda ceiling will gain support...also the view from the living room
View of the interior court yard
The roof now covers the garage and back two bedrooms, note the driveway
The stairs to the second floor for the house in Tres Canadas, Ajijic
Aljibe
Outside the main bedroom
Step by step...
Master bed room plastered inside and outside
The Barrell
Each Front half starts as itself
Continuing to close...
Magic - it's finished...
The Barrell ceiling from the inside
The primer is put on
View of the inside...
The wine cellar door is being cut
The interior arches are being created
The niches are now in arch form
The mirador takes shape...
The driveway is being based
Back of the house
Interior of Mirador prior to floor
Front of the house
The moulding at the barrell ceiling from the inside
The outside of the barrell gets the plaster
Step by step the construction becomes a home
The fireplace is already waiting for a nippy evening
The Canterra spouts for the front drainage are already in
The living room fireplace is being done
The fountain is in and the stairs are ready for marble
The driveway is almost done, all in slate - beautiful
The master fireplace is almost completed
The front walls of the house are practically done
The Chimenia is just about done on the Mirado
The kitchen kick stands are waiting for the cabinetry